Peds...thanks for the reply. Just a couple of follow-ups so I know what we're working with and I can get everything ready for the guy on the next attempt.
1. grounding the RG11 cable will be done with one of these? (http://ecmweb.com/site-files/ecmweb.com/files/archive/ecmweb.com/design_engineering/808ecmGMpic2.gif) And the grounding wire would be attached to the ground bar at the panel, is that correct? I estimate this run at about 75'-80' or so.
2. I would run the RG11 from the dish into the house to the grounding post (above) and then I'd run RG6 from there to my TVs? I have 4 TVs in different locations and am installing a separate HD box at each location. The TVs would range in run length from about 35'-60' from the grounding post at the panel location.
Is this approximately correct in your eyes and will this have any potential for issue from your perspective?
Thanks.